Only 3 basic preparations are required, which are simple to complete with no extra hassle:
① Site Clearing: Remove obstacles such as debris, gravel, weeds and other clutter from the installation site.
② Ground Leveling: Carry out construction in accordance with the provided Site Foundation Design Drawings.
③ Precise Marking: Mark installation positioning lines on the leveled ground according to the dimensions of the house modules.